Historical trench equipment projects: an attributed record

A source-linked directory of one historical Mud Mountain Dam fish-passage project record, the archived equipment claim, and the boundary between project history and protective-system design.

A short directory of attributed project evidence

This short directory records what selected primary and archived sources say about one historical project, rather than presenting a portfolio of current work. The U.S. Army Corps of Engineers announcement supplies the project and contract facts; an archived site article supplies an attributed equipment report. Read each card for its stated limits. Other entries in the old category are not treated as researched cases here. [2] [3] [4]

Mud Mountain Dam fish passage: the project record

A U.S. Army Corps of Engineers Seattle District announcement dated March 15, 2018, records a March 14, 2018 contract award to Kiewit Infrastructure West Company for a fish passage facility around Mud Mountain Dam near Buckley, Washington. The notice describes passage for Endangered Species Act-listed and other fish. Its reference to planned completion by December 2020 was the schedule reported in 2018, not evidence that completion occurred. This directory does not extend the notice to equipment choices or present-day participation. [2]

Read the USACE award announcement

What the historical equipment article actually reports

The archived TrenchShoringBoxes.com article, published June 5, 2019 and updated July 19, 2019, reported that Kiewit Infrastructure West Company “will be utilizing Kundel Industries trench boxes.” That is the old article’s future-tense equipment statement, not independent evidence that boxes were delivered, installed or used successfully. The archive capture is dated March 1, 2021. The displayed byline is only “Jeff.” The USACE notice corroborates the project and contractor, not this equipment claim. [3] [2]

Read the original archived equipment report

The planning question this case raises

A planning question to carry into a different job: which schedule assumptions depend on labor and material availability, weather, and unexpected site conditions? The 2018 USACE notice lists those as inherent construction schedule risks; it does not report what happened at Mud Mountain Dam. Use the question to test a project program, not to infer delays, equipment methods or safety decisions from this case. [2]

Check the announcement’s schedule context

Separate project history from protective-system design

An attributed project report explains what a source said about one job; it is not matched technical evidence for another excavation. For a new site, current protective-system design evidence must be matched to that excavation. OSHA’s protective-systems reference conditions designs drawn from manufacturer tabulated data on all applicable specifications, recommendations and limitations. This directory does not supply that match, approve a system or replace a site-specific design decision. [1]

Read the protective-system design reference

Use the record for context and keep its limits visible

Read the linked USACE notice for the project and contractor facts, the archived article for the attributed equipment statement, and the OSHA reference for the design-evidence boundary. This directory contains one corroborated historical case, not a complete catalog of the old category or a statement that the equipment was deployed. Check the exact source and date before reusing any detail, and treat historical schedule language as historical. [2] [3] [1] [4]

Sources

  1. Occupational Safety and Health Administration: 1926.652 — protective systems
  2. US Army Corps of Engineers Seattle District via DVIDS: USACE Seattle District award announcement — 15 March 2018
  3. TrenchShoringBoxes.com archived project report: Original historical site report — Mud Mountain Dam equipment claim
  4. TrenchShoringBoxes.com (historical category via Internet Archive): Original project-category scope — archived 20 April 2021