Which rules apply to a trench box?

OSHA treats a trench box as a shield. It protects employees inside against cave-in forces; it does not shore the excavation sides. Section 1926.652(c) covers design, and paragraph (g) gives the rules for using the shield. [1] [3] [2]

The two exceptions to cave-in protection

Section 1926.652(a)(1) requires an adequate protective system for each employee in an excavation unless the excavation is entirely in stable rock, or is less than 5 feet deep and a competent person’s examination gives no indication of a potential cave-in. Depth alone is not an exception. [3]

Stable rock means natural solid mineral material that can be excavated with vertical sides and remain intact while exposed. The definition also addresses unstable rock secured by rock bolts or another protective system designed by a registered professional engineer. [1]

Three design routes for shields

For a shield, identify whether the design uses manufacturer tabulated data (§1926.652(c)(2)), other tabulated data (c)(3), or a registered professional engineer’s design (c)(4). The appendix provision in (c)(1) addresses timber and aluminum hydraulic shoring, not shields. [3]

Under the manufacturer route, the design must follow all specifications, recommendations, and limitations issued by the manufacturer. Any deviation requires the manufacturer's specific written approval. Under the other-tabulated-data route, the design must be selected from and follow written data identifying the parameters affecting selection, the limits of use, and explanatory information. That data must identify the registered professional engineer who approved it. [3]

For an engineer-designed trench box outside the first three routes, the written design requirements are a plan showing sizes, types, and configurations of materials and the identity of the approving registered professional engineer. At least one copy of the box design must be at the jobsite during construction. After that, it may be stored offsite but must be available to the Secretary upon request. [3]

Manufacturer data, configuration, and loading limits

With manufacturer data, match the written specifications, recommendations and limitations to the shield on site, its configuration and the expected loads. The written material, including any specific written approval to deviate, must be at the jobsite during construction of the protective system. [3]

The system must resist all intended or reasonably expected loads without failure (§1926.652(a)(2)); a shield must not be subjected to loads beyond its design (§1926.652(g)(1)(i)). [3]

OSHA requires materials and equipment to be free from damage or defects that could impair function. Manufactured materials must be used and maintained consistently with manufacturer recommendations and in a way that prevents employee exposure to hazards. If a trench box is damaged, a competent person must examine the box and evaluate its suitability for continued use. If the competent person cannot assure it can support the intended loads or is otherwise safe, it must be removed from service and approved by a registered professional engineer before returning. [3]

Moving, entering, and excavating below a shield

Install shields to restrict hazardous movement under sudden lateral loads. Protect employees against cave-ins while entering or leaving shielded areas. No employee may be inside a shield during installation, removal or vertical movement. [3]

OSHA permits excavation of earth to a level no more than 2 feet below the bottom of a trench box only if the trench box is designed to resist the forces calculated for the full depth of the trench, and only if there are no indications while the trench is open of possible loss of soil from behind or below the bottom of the box. Both conditions must hold. [3]

Support members and shields have different installation rules

Two parts of §1926.652 refer to different structures. Read paragraph (e) when the member is part of a support system; read paragraph (g) for the shield-specific rules. Similar words about the bottom of a system do not transfer a support rule to a trench box. [1] [3]

Section 1926.652(e) addresses installation and removal of support systems. Section 1926.652(g) addresses shields, including loads, movement and exposure during entry or exit.§1926.652(e) ·supportInstallation and removalof members supporting theexcavation.§1926.652(g) ·shieldShield loads, movementand protection duringentry or exit.
A reading key to the separate support-system and shield provisions.

1926.652(e) governs installation and removal of support systems. It requires members to be securely connected to prevent sliding, falling, kickouts, or other predictable failure; installation and removal to protect employees from cave-ins, structural collapse, and being struck by members; and member loads not to exceed design. It also requires extra precautions before temporary member removal, removal to begin at the bottom and release members slowly, and backfilling to progress with removal. [3]

For shields, use paragraph (g), not the support-member sequence in (e). Both paragraphs mention excavation up to 2 feet below a system, but (e)(2)(i) addresses trench supports and (g)(2) addresses shields; neither gives an unconditional allowance. [3]

Where employee exposure can reasonably be anticipated, a competent person must inspect the excavation, adjacent areas and protective systems before work starts, as needed during the shift, and after every rainstorm or other hazard-increasing occurrence. If evidence of a possible cave-in, system failure, hazardous atmosphere or other dangerous condition is found, remove exposed workers until precautions are taken. [2]

OSHA treats access and egress as a separate check. In trench excavations 4 feet or more deep, 1926.651(c)(2) requires a stairway, ladder, ramp, or other safe means of egress located so no employee must travel more than 25 feet laterally. A trench box plan should confirm that required egress remains available as the box is positioned. [2]

Other 1926.651 requirements may affect shield work in a trench. Before opening an excavation, the estimated location of underground utility installations must be determined, utility owners or utilities contacted within established or customary local response times, and exact locations established as excavation approaches; installations must be protected, supported, or removed while open. Contractors should put those locations on the project plan and keep the trench safety briefing current. Employees may not work in accumulated or accumulating water unless adequate precautions are taken, and water-removal operations must be monitored by a competent person. [2]

Loose rock or soil that could fall or roll from an excavation face must be controlled, and excavated material or equipment must be kept at least 2 feet from the edge or restrained by retaining devices. Workers should also inspect the trench walls and the area near the edge before entry, because changing soil and water conditions can create a new risk. Where oxygen deficiency or a hazardous atmosphere exists or could reasonably be expected, the atmosphere must be tested before employees enter excavations greater than 4 feet deep. These duties sit alongside the shield provisions and depend on the site environment, not only on the shield. [2]

Sources

  1. 29 CFR 1926.650: Scope, application, and definitions applicable to this subpartOccupational Safety and Health Administration
  2. 29 CFR 1926.651: Specific excavation requirementsOccupational Safety and Health Administration
  3. 29 CFR 1926.652: Requirements for protective systemsOccupational Safety and Health Administration