Start a machine-and-equipment evidence worksheet
A small-excavator class or an aluminum label cannot establish that a machine can handle a trench box. Use this worksheet to record what is documented, what remains blank, and who will obtain missing records. Under the cited federal definitions, a trench box is a shield system; shoring supports excavation sides. Record machine/model/configuration, chart revision, proposed assembly, handling location, and transport questions. No exact lift chart or proposed assembly has been reviewed here. This page organizes evidence; it does not approve a pairing or replace project review. [1]
Machine identity and chart inputs
Record exact machine/model/configuration: blank; manual/chart revision: blank; boom/arm and attachment/coupler assumptions: blank. Also record proposed radius, height, orientation, blade position, and chart conditions as blank or not established. A dated Bobcat educational explanation lists configuration, lift-point height, lifting radius, lifting-device length, orientation, and blade position as chart inputs; it is not an approved chart for this machine or a rule for all manufacturers. Do not fill these fields by machine class alone. [4]
Machine identity and chart inputs
Complete assembly and weight evidence
Record exact shield/assembly identity: blank; complete component list: blank; documented assembled mass and units: blank; source and revision: blank; included or excluded attachments and lifting devices: blank. Ask for those records rather than inferring a mass from a product family, label, or machine class. No numeric mass, universal deduction formula, or safe combination is established here. The linked guide's stated-weight field requests exact documentation; it does not verify an assembled mass or a machine match.
Complete assembly and weight evidence
Reach, access and transport questions
Record proposed handling reach and set-down/offload location: blank; access restrictions: blank; documented external and transport dimensions: blank; route and transport arrangements to verify: blank. Keep project observations separate from manufacturer dimensions. These optional project questions establish no transport permission or lift plan. Confirm who will verify each item and attach the matching document or note it as not established.
Reach, access and transport questions
Compare evidence and unresolved questions
For each candidate, record candidate identity: blank; document/section/revision: blank; verified input versus unknown: blank; question: blank; person assigned to obtain the answer: blank. Compare documented candidates without selecting by machine class alone or ranking by best or lightest. Keep unresolved inputs visible and escalate questions that the supplied documents do not answer. The linked guide records documented, conditional, unknown, and escalated inputs with source revision; it does not rank products or approve a lift.
Compare evidence and unresolved questions
Keep the pairing decision unresolved until evidence is reviewed
Keep the pairing unresolved until the actual machine configuration, matching lift chart, complete assembly mass, attachment and lifting-device inclusions, handling location, and transport evidence are obtained. Use the exact documents for the named model and revision, and obtain appropriate project review where decisions depend on site conditions or protective-system design. The cited federal references support terminology and protective-system context only; they do not approve a product, machine match, or site. A blank worksheet is a record to complete, not a safety determination. [1] [3]