The Indiana gallery and the space under the spreaders
The Big Clear caption describes clearance to the underside of the lowest spreader. The gallery gives a product maximum, not the clearance measured on site. [1]
On June 17, 2020, TrenchShoringBoxes.com described an Indiana contractor using lightweight hybrid steel boxes with Big Clear raised spreaders. Gallery captions name Atlas Excavating and describe a product maximum measured to the underside of the lowest spreader. They do not give the measured opening under the spreader on this job or explain why a particular position was selected. [1]
The publisher described the excavation as deep and said the contractor had used the equipment on earlier jobs. It gave no depth in feet. [1] [2]
What would establish the clear opening?
For the opening as designed, ask for the assembly drawing and revision for the particular hybrid box, Big Clear members and connections. On that drawing, identify the spreader position and the reference surface used for clearance: a height to the center of a member is not the free height to its underside. For a crossing, the opening at the crossing location matters, not the overall panel height. [1]
Only a measurement of the installed spreader, or a dimensioned record from the Indiana job, would establish how much room Atlas had there. [1]
Sources
- Kundel Hybrid Steel Trench Boxes and Big Clear, Indiana jobsite (archived post)TrenchShoringBoxes.com (archived listing)
- Kundel Trench Boxes Working in the Field (archived category page)TrenchShoringBoxes.com (historical category via Internet Archive)