Titan 3 Lite Utility: five ST lengths in the 4-foot column

Find the five ST length labels in Kundel’s Titan 3 Lite Utility brochure and distinguish nominal length from working clearance and assembled weight.

Updated November 20, 20262 min read

Which Utility model is it?

Kundel’s January 2001 Utility sheet covers several shields. Look for the panel headed “Titan 3 Lite Utility,” not the neighboring “Titan Plus 3 Utility.” The copyright dates the sheet, not the manufacture of a particular box. [3] [4]

Five lengths under the 4-foot heading

The Titan 3 Lite Utility panel lists 6′ - ST, 8′ - ST, 10′ - ST, 12′ - ST and 14′ - ST under 4′. In the neighboring 5′ column, those same lengths carry a K suffix. A length alone therefore does not identify the row. [4]

For this model, the brochure shows a 3½-inch side wall and a 12-inch knife-edge taper. Those are dimensions of the panel, not of the space between panels. [4]

None of these lengths gives a clear opening at a pipe or an allowable trench depth. The spreader positions, inside dimensions and permitted loads come from the drawing and design data for the marked assembly. [4]

A shield for light utility work

Kundel describes the Titan 3 Lite as solid-welded, all-steel construction for light work. It lists manholes, spot repairs and mainline work as applications of the broader Utility range. [3]

A trench shield withstands cave-in forces to protect people inside. Unlike shoring, its purpose is not to support the sides of the excavation. [1]

What the size label leaves out

Two rows can describe a ten-foot length without describing the same box. The column heading and suffix distinguish them. [4]

The ten-foot length is labeled ST under the four-foot heading and K under the five-foot heading.4-foot heading10′ - ST in the Titan 3Lite Utility panel.5-foot heading10′ - K in the samepanel.
Two ten-foot entries in the Titan 3 Lite Utility brochure.

The brochure separates the shield-weight and machine-weight columns. It does not state a weight unit or which parts are included in the shield weight. For a lift, obtain a weight with units for the identified box in its fitted configuration, including the spreaders and any attachments being moved. [4]

When a shield design uses manufacturer’s tabulated data, the specifications, recommendations and limitations must be in writing at the jobsite while the system is constructed. A departure requires the manufacturer’s specific written approval. [4] [2]

Condition and handling

A competent person must examine damaged protective equipment. If they cannot assure that it will support the intended loads or is otherwise suitable, it must leave service until a registered professional engineer evaluates and approves its return. [2]

Use the box’s handling instructions and the lift information for the excavator and rigging actually proposed. Matching a historical size is not a machine selection. [4]

Sources

  1. 29 CFR 1926.650: Scope, application, and definitions applicable to this subpartOccupational Safety and Health Administration
  2. 29 CFR 1926.652: Requirements for protective systemsOccupational Safety and Health Administration
  3. Titan Series Utility Trench ShieldKundel Industries
  4. Titan Utility Shields — Titan 3 Lite Utility panel (© January 2001)Kundel Industries