Scoping aluminum shoring or shielding for utility work

Send the specialist verified field dimensions, service locations, work sequence and handling constraints. Ask the supplier separately about the proposed function and governing documents.

Updated November 20, 20263 min read

What to show on the utility sketch

Show the work area and the stage of work. Label dimensions from drawings separately from measurements taken at the exposed connection. A specialist needs to know which opening is needed for the repair, not just the pipe diameter. [2] [3]

Make the utility crossing legible

A response from one utility does not locate another service on the same route. An estimate also serves a different purpose from determining the exact position as work approaches a line. [2]

The first panel describes an estimate from the utility owner or operator; the second distinguishes determining exact location as excavation approaches.Estimated positionInformation from theutility owner or operatorhelps locate a line.Exact positionDetermine the exactlocation by safe andacceptable means asexcavation approaches it.
An estimated location and an exact location are not interchangeable.

For a valve repair, for example, mark the space taken up by the valve and connection, where people need to work and where the crossing service lies. Separate the open length needed for the task from the length available to place or withdraw equipment. Show each change of stage; workers may not occupy a shield while it is being installed, removed or moved vertically. [2] [3] [4]

Estimate underground installation locations and contact the owners before opening the excavation. As work approaches an estimated location, determine the exact location by safe and acceptable means. While the excavation is open, protect, support or remove installations as necessary to safeguard employees. Keep a separate response and verification status for each service; one owner’s reply does not resolve another’s crossing. [2]

Mark constraints outside the opening

For a trench at least four feet deep, locate a stairway, ladder, ramp or other safe means of egress within 25 feet of lateral travel for each employee. On the same sketch, mark machine approach, spoil, vehicle traffic and nearby structures. Where excavation endangers the stability of adjoining structures, required support is a separate question from whether a shield fits around the pipe. [2] [1]

Record whether site conditions have changed since the sketch: water has appeared, the machine position has moved or the available width has narrowed. Send the change to the person evaluating the design; do not convert an estimate into a rating or treat supplier paperwork as an inspection of the ground. [2] [3]

Ask which protective function the offer actually provides

A shield withstands cave-in forces to protect people within it. Aluminum hydraulic shoring applies pressure to support excavation sides through hydraulic crossbraces and uprights or wales. A request to support a nearby foundation needs its own description. “Aluminum” answers none of these questions. [1] [2]

For valve work and spot repairs, the sides, ends and openings can matter more than the family name. Ask the supplier for the proposed drawing, weight and limitations. Compare those limits with the conditions at the crossing. [3] [4] [5]

Sources

  1. 29 CFR 1926.650: Scope, application, and definitions applicable to this subpartOccupational Safety and Health Administration
  2. 29 CFR 1926.651: Specific excavation requirementsOccupational Safety and Health Administration
  3. 29 CFR 1926.652: Requirements for protective systemsOccupational Safety and Health Administration
  4. Aluminum Trench Shield Product Application GuideEfficiency Production / Arcosa Shoring Products
  5. Build-A-Box Modular Aluminum Trench Shielding System — features and assemblyGriswold Machine & Engineering / Arcosa Shoring Products