Apply the same standard to both offers
Apply the same questions to the new unit and the used one: which assembly is actually offered, what design covers it and what condition are its components in? Compare the marked panels, spreaders and connections with the documents for each particular shield. [3]
Additional questions for the used unit
A bent pin and a replacement pin raise different questions even if they look alike in the seller’s photograph. One question concerns condition; the other concerns whether the part belongs to the documented configuration. A receipt for a new pin does not settle either one for the unit offered. [3]
Ask the seller to identify which records belong to this particular shield. A maintenance invoice can show that work was billed; it does not, by itself, identify the member repaired, show whether the repair changed the configuration, or establish suitability for the intended loads. [3]
For example, a replaced pin that fits the socket is still a configuration question: is it the pin specified for this assembly? A bent connection is a condition question even if its part number matches. Keep the two findings separate; a parts receipt answers neither by itself. [1] [3]
Which gaps prevent relying on the box?
If the sheet does not identify the delivered configuration, obtain the applicable document. For shields the design basis may be manufacturer’s tabulated data, other engineer-approved tabulated data or a registered professional engineer’s written design. The timber and aluminum hydraulic shoring appendix provisions are not shield tables. Under the manufacturer’s-data route, departures need that manufacturer’s specific written approval. [3]
If equipment is damaged, a competent person must examine it and evaluate suitability for continued use. If that person cannot assure it can support the intended loads and is otherwise safe, remove it from service. It must be evaluated and approved by a registered professional engineer before return. This is not a blanket requirement for engineering approval of every secondhand purchase. [3]
An unknown former owner is a lead to pursue, not proof that the unit is unsafe. But if the missing history leaves damage, an alteration, a parts mismatch or the design basis unresolved, do not rely on the unit for the intended work until the appropriate evidence or evaluation closes that gap. [3]
Keep sale terms and field decisions separate
Put the asking price, included spares, delivery, warranty and service availability in the purchase file. Ask the seller for written terms and your yard manager about storage and transport. An unanswered quote for a spare is a commercial uncertainty; a missing required fastener is a configuration issue. Neither a discount nor a seller’s reassurance resolves the latter. [3]
Even a complete unit record does not authorize entry. The employer must provide protection appropriate to the excavation. Where exposure can reasonably be anticipated, the competent person inspects the excavation, adjacent areas and protective systems before work, as needed during the shift and after hazard-increasing events. Remove exposed employees when a hazard is found until necessary precautions have been taken. [2] [3]
Sources
- 29 CFR 1926.650: Scope, application, and definitions applicable to this subpartOccupational Safety and Health Administration
- 29 CFR 1926.651: Specific excavation requirementsOccupational Safety and Health Administration
- 29 CFR 1926.652: Requirements for protective systemsOccupational Safety and Health Administration