What the supplier needs to know about the excavation
A hydraulic shoring quote starts with the excavation: its depth, width and length, the space people need to work, and the soil classification and observations behind it. [1] [3]
Describe water, traffic and equipment loads as well as nearby utilities and foundations. These conditions affect whether a proposed arrangement falls within the governing data. [2] [3] [4]
What comes with the rails and cylinders?
Compare the whole package, not just the price of a shore. A proposal may list vertical rails or horizontal wales, hydraulic cylinders and connections, sheeting or pads, and the pump, hoses, couplers and gauge. Distinguish included equipment from optional or separately supplied parts. [1] [3] [4]
Match the model and quantity of each component to documentation covering its use with the others. A family brochure is not evidence that a separately supplied accessory fits the proposed arrangement. [3] [4]
Read the design basis beside the quote
A quote can include every listed hydraulic component and still leave the design basis unanswered. Ask the supplier to identify which record covers that particular arrangement: Appendix D has a defined scope, not a table for every set of rails and cylinders. [3] [4]
Appendix D covers aluminum hydraulic shoring in trenches no deeper than 20 feet when a design cannot be prepared from the manufacturer’s tabulated data under the appendix route. It gives arrangements for vertical shores in Type A and B soil and horizontal wales in Type B and C soil. Its tables have limits on vertical loads, equipment surcharges and partially shored excavations; they do not cover every field condition. [4] [3]
Where the manufacturer's tabulated data is the route, two written obligations matter to a buyer. Any deviation from the manufacturer's specifications, recommendations or limitations requires the manufacturer's specific written approval, and the specifications along with any approval must be in written form at the jobsite while the protective system is being constructed. [3]
If other tabulated data is proposed, the request should cover the written tables and charts, identification of the parameters that govern selection, the limits of use, explanatory information needed for correct selection, and the identity of the registered professional engineer who approved the data. A supplier response missing any of those elements is incomplete for review purposes. [3]
Condition of used equipment
Damaged equipment follows a defined path. A competent person examines it and evaluates whether it is suitable for continued use; if that person cannot assure it will support the intended loads or is otherwise suitable for safe use, it is removed from service and must be evaluated and approved by a registered professional engineer before its release back into service. [3]
An itemized price does not resolve an undocumented repair or show that a substitute part is suitable. Tie the offered parts and their condition to the records for the proposed assembly. [2] [3]
Sources
- 29 CFR 1926.650: Scope, application, and definitions applicable to this subpartOccupational Safety and Health Administration
- 29 CFR 1926.651: Specific excavation requirementsOccupational Safety and Health Administration
- 29 CFR 1926.652: Requirements for protective systemsOccupational Safety and Health Administration
- 29 CFR 1926 Subpart P, Appendix D: Aluminum Hydraulic Shoring for TrenchesOccupational Safety and Health Administration