Which hazard does the equipment address?
A shield, a ladder and an air monitor may all be needed at the same trench. They do different jobs: one resists cave-in forces, one provides a way out, and one can detect a hazard that neither of the others addresses. [1] [2]
Shields and shoring
A trench box is a shield: it protects people inside rather than supporting the soil behind its walls. Excavation up to 2 feet below a shield is permitted only when it is designed for forces calculated for the full trench depth and there are no indications of possible soil loss from behind or below it while the trench is open. [1] [3]
Install a shield to restrict hazardous movement under sudden lateral loads. Employees must be protected against cave-ins when entering or leaving its protection. No one may be inside while a shield is installed, removed or moved vertically. [3]
Aluminum hydraulic shoring uses cylinders with uprights or wales to support the excavation sides. Connect support members to prevent sliding, falling or kickouts, and keep loads within their design limits. [1] [3]
Ladders, ramps and crossings
A ladder answers a travel question, not a soil question. Even when a shield and a means of egress appear on the same equipment list, the list does not show whether the worker is protected from cave-ins on the way into or out of the shielded area. [1] [2] [3]
Trenches 4 feet deep or more need a stairway, ladder, ramp or other safe means of egress within 25 feet of lateral travel. A ladder beyond that distance is too far away even if the crew is working inside a shield. [2]
Structural ramps in trench projects carry their own conditions. A ramp used solely by employees for access or egress must be designed by a competent person; one used for equipment must be designed by a competent person qualified in structural design and built to that design. Ramps and runways built from two or more steel or wood structural members need those members connected to prevent displacement, members of uniform thickness, and cleats or connectors attached at the bottom or in a way that prevents tripping. Steel or wood ramps used in lieu of steps need cleats or other slip-resistant surface treatment. [2]
Provide a walkway where workers or equipment cross an excavation. Where the walkway is 6 feet or more above a lower level, it needs guardrails meeting §1926.502(b). [2] [3]
Edge, Traffic and Falling-Material Safety Controls
Keep soil, materials and equipment that could fall or roll in at least 2 feet from the edge, use retaining devices that prevent such movement, or use both. Loose rock or soil on the face requires scaling, protective barricades or equivalent protection. [2]
Mobile equipment near a trench edge creates a separate safety concern. Where equipment operates adjacent to an excavation, or must approach the edge, and the operator lacks a clear and direct view of that edge, a warning system is required, with barricades, hand or mechanical signals, or stop logs named as examples. The grade should run away from the excavation where possible. [2]
Employees exposed to public vehicular traffic must have and wear high-visibility or reflectorized garments. No one may stand beneath a load handled by lifting or digging equipment, and employees must stand clear of vehicles being loaded or unloaded. [2]
Atmospheric Testing, Ventilation and Emergency Equipment
Test the air before entry into an excavation deeper than 4 feet where oxygen deficiency or another hazardous atmosphere exists or could reasonably be expected, such as near stored hazardous substances. Oxygen below 19.5 percent is deficient. [2]
A meter detects a hazard; it does not remove it. Take adequate precautions, such as ventilation or proper respiratory protection, to prevent exposure. Prevent exposure to flammable gas above 20 percent of its lower flammable limit. When controls reduce contaminants to acceptable levels, repeat testing as often as necessary to confirm conditions remain safe. [2]
Where hazardous atmospheric conditions exist or may reasonably be expected to develop, emergency equipment such as breathing apparatus, a safety harness and line, or a basket stretcher must be readily available and attended when in use. Employees entering bell-bottom pier holes or similar deep, confined footing excavations must wear a harness with a separately attended lifeline. These provisions do not classify a trench as a permit-required confined space, and they do not set out rescue, respiratory or rigging procedures. [2]
Water, Utilities and Adjacent Structures Change the Safety Plan
Employees must not work in accumulated or accumulating water without adequate precautions. Depending on the hazard, these can include special supports or shields, water removal, or a safety harness and lifeline. A competent person must monitor water-removal equipment and operations. Where work interrupts natural drainage, divert surface water away from the excavation. [2]
Underground installations call for a sequence rather than an item. Before opening an excavation, determine the estimated location of utility installations reasonably expected to be encountered and contact utility owners within established or customary local response times. If owners cannot respond within 24 hours—or a longer period required by state or local law—or cannot establish exact location, the employer may proceed only with caution and with detection equipment or another acceptable locating method. As excavation approaches, confirm exact location by safe and acceptable means, then protect, support, or remove open installations as necessary. [2]
When excavation endangers adjacent buildings, walls or other structures, provide support such as shoring, bracing or underpinning. A shield does not support a neighboring footing. Sidewalks and pavements must not be undermined without bracing or other protection. [2]
Design records, inspections and damaged equipment
Paragraph 1926.652(c) allows protective-system designs drawn from the appendices, from the manufacturer's tabulated data, from other engineer-approved tabulated data, or from a registered professional engineer. Where manufacturer data for shoring equipment or a trench box is used, its specifications, recommendations and limitations must be followed; any deviation needs the manufacturer's specific written approval; and the material must be in written form at the jobsite while the system is built. Engineer-approved tables must identify the engineer who approved them. [3]
Where employee exposure can reasonably be anticipated, a competent person must inspect the excavation, adjacent areas and protective systems before work starts, as needed throughout the shift, and after every rainstorm or other hazard-increasing occurrence. Remove exposed workers when a possible cave-in, protective-system failure, hazardous atmosphere or other dangerous condition is found, until the necessary precautions are taken. [2]
Equipment condition is part of that safety check. Materials and equipment used in protective systems must be free of damage or defects that might impair function, and manufactured items must be used and maintained consistently with the manufacturer's recommendations. Damaged material or equipment—including trench boxes—must be examined by a competent person; if its suitability cannot be assured, it comes out of service and needs a registered professional engineer's evaluation and approval before returning. [3]
Sources
- 29 CFR 1926.650: Scope, application, and definitions applicable to this subpartOccupational Safety and Health Administration
- 29 CFR 1926.651: Specific excavation requirementsOccupational Safety and Health Administration
- 29 CFR 1926.652: Requirements for protective systemsOccupational Safety and Health Administration