Before the first worker enters
Determine the estimated location of underground utilities before opening the excavation and contact utility companies or owners within established or customary local response times. If the owner cannot respond within 24 hours (or a longer period under state or local law), the employer may proceed only with caution and acceptable locating means. [2]
Other pre-entry trench checks are concrete: remove or support surface encumbrances that could endanger employee safety. At 4 feet or more in a trench excavation, place a stairway, ladder, ramp or other safe means of egress so workers travel no more than 25 feet laterally. Where oxygen deficiency or a hazardous atmosphere exists or could reasonably be expected, test the atmosphere before employees enter an excavation deeper than 4 feet. [2]
Cave-in protection is required unless the excavation is entirely in stable rock, or is less than 5 feet deep and a competent person’s examination finds no indication of a potential cave-in. If the design uses manufacturer tabulated data, follow the manufacturer’s specifications, recommendations and limitations. Any deviation needs its specific written approval. [3] [1]
NIOSH recommends planning spoil and equipment routes away from the edge, scheduling protection before entry and preparing an emergency plan before work starts. [4]
Who can stop the work?
A competent person must be capable of identifying existing and predictable hazards and authorized to take prompt corrective measures. Expertise alone is not enough if the person cannot act on what they find. [1] [4]
If the competent person finds evidence of a possible cave-in, protective-system failure, hazardous atmosphere or other dangerous condition, exposed workers must leave the affected area until the necessary precautions are in place. [2] [4]
Inspection timing
Where employee exposure can reasonably be anticipated, the competent person must inspect the excavation, adjacent areas and protective systems before work starts, as needed throughout the shift, and after every rainstorm or other hazard-increasing occurrence. [2]
When water, equipment or the configuration changes
After a rainstorm, the federal trigger is explicit: the competent person must inspect again. Water adds its own trench safety requirements. In trench work, workers must not work in a trench or other excavation with accumulated or accumulating water unless adequate precautions protect them from cave-ins and water hazards; precautions can include special support or shield systems, water removal, or a safety harness and lifeline. Water-removal equipment and operations must be monitored by a competent person. Excavations subject to heavy-rain runoff also require a competent-person inspection. [2]
Damage to protective-system equipment calls for a competent person’s examination. If that person cannot assure the item can carry its intended loads or is otherwise safe, it must be removed from service until a registered professional engineer evaluates and approves its return. [3]
A changed spreader arrangement can take a shield outside its manufacturer’s data. Check the proposed arrangement against the documentation for the specific shield; departure from the specifications, recommendations or limitations requires specific written manufacturer approval. [3] [5]
What the incoming crew needs to know
A handover can pass on the time of the last inspection; it cannot pass on a finding about conditions that changed afterward. A rainstorm, for example, calls for a new competent-person inspection where employee exposure can reasonably be anticipated. [2]
At handover, identify the last inspection and any changes since then. Tell the incoming crew where to find the governing design records. For a manufacturer-data design, the required written material must be at the jobsite while the protective system is being constructed. [3]
Be explicit about any area workers must stay out of and any equipment removed from service. Passing that information to a new shift does not authorize re-entry or return a damaged unit to service. [2] [3]
Sources
- 29 CFR 1926.650: Scope, application, and definitions applicable to this subpartOccupational Safety and Health Administration
- 29 CFR 1926.651: Specific excavation requirementsOccupational Safety and Health Administration
- 29 CFR 1926.652: Requirements for protective systemsOccupational Safety and Health Administration
- Preventing Worker Deaths from Trench Cave-ins (NIOSH Workplace Solutions 2011-208)CDC and NIOSH
- Steel Trench ShieldsPro-Tec Equipment